Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />TABLE 12 <br />Oty of Fountain <br />Keeton Dam Spillway <br />Feasibility Construction Cost Estimate <br /> <br />Alternative F - Emergency Spillway Enlargement, Long Channel <br />Lower Existing Emergency Spillway Crest to Elevation 6416.5 and Widen to 30 Feet. <br /> <br />I <br /> <br />Item <br /> <br />I <br /> <br />GENERAL PROJECT WORK <br />1 Mobilization and demobilization <br />2 Dewater <br /> <br />I <br /> <br />EARTHWORK <br />3 Excavate, load & haul reservoir sediments <br />4 Strip, stockpile & replace topsoil <br />5 Excavate, load & haul spillway soils <br />6 Excavate, load & haul spillway bedrock <br />7 Place spillway bedrock <br />8 Fill & compaction of spoil material <br /> <br />I <br /> <br />I <br /> <br />PIPING <br />9 Intake modification <br />10 Sedimentation trap <br /> <br />I <br /> <br />I <br /> <br />SITE REMEDIATION <br />11 Revegitation <br />12 Environmental Mitigation <br /> <br />I <br />I <br /> <br />General Project Work (Items 1-2) <br />Earthwork (Items 3-8) <br />Piping (Item 9-10) <br />Site Remediation (Items 11-12) <br />Unscheduled Construction Items <br />* Base Construction Costs - Subtotal <br /> <br />Construction Contingency: <br />* Base Construction Costs - Total <br /> <br />I <br /> <br />Engineering and Inspection: <br />* Total Project Costs - Year 2000 Dollars <br /> <br />I <br /> <br />* Total Project Costs - Year 2002 Dollars <br /> <br />Note: All material quantities are in place volumes <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Base Quantity Unit <br />Quantity Adjust Quantity Unit Price <br />1 1.00 1.00 Is $20,000.00 <br />1 1.00 1.00 Is $5,000.00 <br />5,600 1.00 5,600 cy $2.25 <br />1,872 1.00 1,872 cy $4.00 <br />2,714 1.00 2,714 cy $4.00 <br />10,714 1.00 10,714 cy $15.00 <br />4,000 1.00 4,000 cy $2.00 <br />15,028 1.00 15,028 cy $2.00 <br />1 1.00 1.00 Is $10,000.00 <br />1 1.00 1.00 Is $5,000.00 <br />1.9 1.00 1.9 ac $2,200.00 <br />1 1.00 1.00 Is $5,000.00 <br /> <br />10% <br /> <br />15% <br /> <br />10% <br /> <br />7% Inflation 2000 to 2002 <br /> <br />Project <br />Amount <br /> <br />$20,000 <br />$5,000 <br /> <br />$13,000 <br />$7,000 <br />$11,000 <br />$161,000 <br />$8,000 <br />$30,000 <br /> <br />$10,000 <br />$5,000 <br /> <br />$4,000 <br />$5,000 <br /> <br />$25,000 <br />$230,000 <br />$15,000 <br />$9,000 <br />$28,000 <br />$307,000 <br /> <br />$46,000 <br />$353,000 <br /> <br />$35,000 <br />$388,000 <br /> <br />$415,0001 <br />