My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02019
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 11:16:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0069FX
Contractor Name
Fountain, City of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ALTERNATIVES CONSIDERED <br /> <br />General <br /> <br />The feasibility study for the proposed abandonment of the Keeton Dam and <br />Reservoir reviewed seven alternatives. These included: <br /> <br />Alternate A - Reconstruct the existing spillway on the south side of the reservoir to <br />a width of 50 feet and lower the spillway crest roughly 14 feet. Leave a remnant <br />reservoir pool to control sedimentation and icing condition problems during water <br />diversions. <br /> <br />Alternate B - Construct a 50-foot wide overflow channel through the existing dam. <br />Leave a remnant reservoir pool to control sedimentation and icing conditions during <br />water diversion. Construct a berm below the dam to redirect flow back into the <br />existing stream channel near the south side of the valley. <br /> <br />Alternate C - Remove a section of the dam to the historic streambed level, with a <br />50-foot wide channel. Construct a new diversion dam near the original dam, with a <br />sand sluice gate and a new ditch diversion headgate. Construct a berm below the <br />dam to redirect flow back into the existing stream channel near the south side of <br />the valley. <br /> <br />Alternate D - This alternative is similar to Alternate B, with overflow channel drop <br />structure designed to meet City of Colorado Springs! EI Paso County's Urban <br />Drainage and Flood Control standards, which includes widening the channel and <br />drop to 150 feet. Leave a remnant reservoir pool to control sedimentation and icing <br />conditions during water diversion. The project would include a berm constructed <br />below the dam to redirect flow back into the existing stream channel near the south <br />side of the valley. <br /> <br />Alternate E - Construct a 50-foot wide overflow channel through the existing dam. <br />Leave a remnant reservoir pool to control sedimentation and icing conditions during <br />water diversion. Construct a berm below the dam to redirect flow back into the <br />existing stream channel near the south side of the valley. Avoid the wetlands and <br />the existing turnout structure. <br /> <br />Alternate F - This alternate is similar to Alternate A. Reconstruct the existing <br />spillway on the south side of the reservoir to a width of 30 feet and lower the <br />spillway crest roughly 12.5 feet. Leave a remnant reservoir pool to control <br />sedimentation and icing condition problems during water diversions. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.