Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />Table 8. Opinion of Probable Construction Cost <br /> <br />I <br /> <br />ITEM DESCRIPTION <br /> <br />QUANTITY UNIT <br /> <br />UNIT <br />COST <br /> <br />TOTAL <br />COST <br /> <br />I <br /> <br />STORAGE AND PUMP SYSTEMS <br /> <br />I <br /> <br />North Pump Station (11,700 GPM @ 75 PSI) <br />Intake system, building, and electrical <br />North Pond (50 acre-feet) <br />Land Aquistion for new North Pond <br />Middle Pump Station (11,700 GPM @ 90 PSI) <br />Intake system, building, and electrical <br />Middle Pond (60 acre-feet) <br />Aeration and Ozone System <br />South Pump Station (11,700 GPM @ 116 PSI) <br />Intake system, building, and electrical <br /> <br />Construction Contingency (7.5% of Subtotal) <br />Engineering Design Fees (6% of Subtotal) <br /> <br />1 LS $300,000 $300,000 <br />1 LS $147,200 $147,200 <br />81000 CY $1.5 $121,500 <br />1 LS $250,000.0 $250,000 <br />1 LS $330,000 $330,000 <br />1 LS $153,000 $153,000 <br />96800 CY $1,5 $145,200 <br />1 LS $75,000.0 $75,000 <br />1 LS $364,000 $364,000 <br />1 LS $158,200 $158,200 <br /> $2,044,100 <br />21,720 LF $20 $434,400 <br />15,100 LF $25 $377,500 <br />40,930 LF $32 $1,309,760 <br />28,200 LF $35 $987,000 <br />38,250 LF $45 $1,721,250 <br />7,000 LF $60 $420,000 <br />4,325 LF $90 $389,250 <br />3,550 LF $125 $443,750 <br />1 LS $608,291 <br />1 LS $150,000 $150,000 <br />12 Ea. $1,000 $12,000 <br />6 Ea, $5,500 $33,000 <br />2 Ea, $50,000 $100,000 <br /> $6,986,201 <br /> $9,030,301 <br /> $677,300 <br /> $541 ,800 <br /> $10,249,4011 <br /> <br />I <br /> <br />I <br /> <br />SUBTOTAL - PUMP SYSTEM <br /> <br />I <br /> <br />TRANSMISSION SYSTEM <br />8-inch C900 PVC <br />12-inch C900 PVC <br />16-inch C905 PVC <br />18-inch C905 PVC <br />20-inch C905 PVC <br />24-inch C905 PVC <br />30-inch C905 PVC <br />36-inch C905 PVC <br />Pipe fittings - estimated at 10% of Total Pipe Costs <br />Isolation Gate Valves <br />Blow-off assembly <br />Standard 2" Air-Vacuum Relief valve <br />Pressure Reducing / Sustaining Valve Assemblies <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SUBTOTAL - TRANSMISSION SYSTEM <br /> <br />I <br /> <br />SUBTOTAL <br /> <br />I <br /> <br />IGRAND TOTAL <br /> <br />I <br /> <br />Notes/Assumptions: <br />1) Mainline diversions / gates and downstream laterals will be paid for by others and are not included, <br />2) Railroad and road/street crossings are assumed to be existing based on preliminary pipe network routing <br />and therefore, separate line items are not included for crossings. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Aqua Engineering, Inc, <br />June 7,2004 <br /> <br />Canal Modernization Feasibility Study <br />- 18- <br />