My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02011
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2010 9:25:17 AM
Creation date
7/9/2007 9:25:57 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
04000000048
Contractor Name
Lake Canal Reservoir Company
Contract Type
Grant
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Table 5 <br />Lake Canal Company <br />Analysis of Past Poudre Basin Droughts <br />And Drought Response under a Lake Canal Secondary Supply System <br /> <br />I <br />I <br />I <br /> <br />Past Drought Historical Drought Description Presumed Notes <br />Event Year Lake Canal Drought <br /> Diversion 1 Stage I <br /> Drought <br /> Response <br /> (acre-feet) <br />1937 No data n/a unknown <br />101,000 AF deficit on the available in <br />Poudre River Hydrobase <br />1954 8,920 This drought is considered 1 C-BT system not yet <br />177,000 AF deficit on the (5,412 AF early significant in the record but commissioned so no <br />Poudre River and 3,508 AF late) early water was quite adequate adjustment to the Lake <br /> and late surface water was Canal diversion is made. <br /> likely also adequate. <br />1977 6,394 Sufficient early water but a 2 <br />170,000 AF deficit on the (4,358 AF early deficit of approximately 250 AF <br />Poudre River and 2,036 AF late) of late surface water. Well <br /> pumping would have made up <br /> the deficit. <br />1987 6,357 Sufficient early water and 2 <br />130,000 AF deficit on the (3,728 AF early approximately enough late <br />Poudre River and 2,629 AF late) surface water. Well pumping <br /> would have made up the deficit. <br />2002 5,165 Early water would have been 4 The critical drought in the <br />204,000 AF deficit on the (2,204 AF early insufficient with a deficit of 100 Poudre Basin is the 2002 <br />Poudre River and 2,961 AF late) AF or more and late water drought - estimated by <br /> would have been deficient as proxy data to be a 300- <br /> well, Likely wells would have year event. <br /> been used throughout the <br /> season in 2002, <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />1 Lake Canal diversions are adjusted so as to not include C-BT water that will not be available under future drought <br />events. <br />
The URL can be used to link to this page
Your browser does not support the video tag.