Laserfiche WebLink
<br />THE LAKE CANAL COMPANY <br />THE LAKE CANAL RESERVOIR COMPANY <br /> <br /> <br />(970) 352-0222 <br /> <br />'-=... - .'"#~ <br />~""":"----- <br /> <br />June 19,2003 <br /> <br />John Van Sciver, P.E. <br />Colorado Water Conservation Board <br />1580 Logan, Suite 750 <br />Denver, Co 80203 <br /> <br />RE: Lake Canal Company <br />Pressurization Master Plan <br /> <br />John: <br /> <br />The Lake Canal Company has closely followed the Dual Water System Study that CSU <br />has led and CWCB has funded. It is the opinion of the Board of Directors that this is the <br />probable future ofthe Lake Canal Company's service to the community and has <br />commissioned Steve Smith and John Wilkins-Wells to develop a master plan for <br />pressurized irrigation. It is anticipated that the Master Plan would lead to the <br />development of structures such as ponds, pumping stations and main lines that would <br />facilitate pressurized irrigation. We request a grant, in a maximum amount of$5000.00, <br />to pay for up to 50% ofthe cost ofthis planning. This Master Plan will be done in <br />accordance with the CWCB guidelines and format for feasibility studies. <br /> <br />The engineering scope of work and cost estimate are attached. <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Superintendent <br /> <br />33040 Railroad Avenue · P.O. Box 104 · Lucerne, Colorado 80646 <br />