Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />f!:Qject Aw>roach and Feasibilitv <br /> <br />Cost Evaluations <br /> <br />Opinions of Probable Construction Cost were developed for each anticipated phase of <br />construction using unit prices based on currently available information from similar <br />projects, equipment manufacturer input, and regional contractor input. The costs <br />presented here are based upon the conceptual design described in this feasibility study. <br />Any changes to the concept will affect these costs. These costs may be used to assist in <br />determining if the project is feasible. Final design and construction documents should be <br />used to estimate the actual construction cost of the project prior to having contractors <br />provide bid pricing for specific construction phases. Tables 8 through 13 show the <br />anticipated items, equipment, and costs associated with each construction phase for this <br />project. <br /> <br />Aqua Engineering, Inc. <br />and Colorado State University <br />May 19, 2004 <br /> <br />Secondary Supply Feasibility Study <br />-36- <br />