My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02008
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:37 AM
Creation date
7/9/2007 8:43:02 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0073FX
Contractor Name
Lamar, City of
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Executive Summary <br /> <br />The City of Lamar in southeastern Colorado utilizes potable water for both culinary <br />needs and landscape irrigation. An alternative to this is the implementation of a <br />secondary supply system for landscape irrigation. This allows beneficial use of the <br />existing and owned surface water supply from Fort Bent Ditch Co. along with an <br />expansion of the existing well water sources north of the railroad. <br /> <br />Some additional features of the project will utilize existing infrastructure and features <br />where possible including phasing of the project. <br /> <br />The development of a pressurized secondary supply irrigation transmission system is <br />proposed to provide irrigation water on demand throughout the City of Lamar. A network <br />of raw water storage reservoirs, pump stations, and pipelines is conceptualized in this <br />study to provide the water required for irrigation purposes. <br /> <br />The report also contains a brief discussion of some socio-economic characteristics <br />within the City that support the engineering feasibility aspects of the study including the <br />phasing of the project. <br /> <br />Probable costs have been estimated by phase. The construction can be phased based <br />on available funding and logical system expansion approach, in addition to the socio- <br />economic elements within the community. <br /> <br />The study reported here has determined that the implementation and use of a secondary <br />supply system is feasible. <br /> <br />The anticipated layout of the system, the nature and quality of the service, and future <br />system operations are conceptualized. These have been utilized in the development of <br />the anticipated costs for each phase. <br /> <br />Conclusions and recommendations are provided at the end of the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.