My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02005
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:37 AM
Creation date
7/9/2007 7:54:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0074FX
Contractor Name
Highland Ditch Company
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses ofthe Applicants' engineer(s) and attomey(s). <br /> <br />NAME <br /> <br />J e f f Ka h n <br /> <br />ADDRESS and PHONE <br /> <br />4803 Innovation Drive, Fort ColI ins 970.229.9668 <br /> <br />1225 Red Cedar Circle RH, Fort' Coll ins, 970.490. <br />2620 <br />515 Kimbark Street, Longmont, 303.776.9900 <br /> <br />Aqua Engineering <br />Smith Geotechnical <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Fe a sib i 1 i t Y S t u d y, A qua En gin e e r i n g for D u a 1 / S e con d a r y <br /> <br />water stystems. Please see attachment. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: $ <br /> <br />Estimated Construction Costs: $ <br /> <br />Estimated Total Costs: $ <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 4 mil 1 ion 9 Hun d red (Usually 75% of Estimated Total Costs) <br />Term (length) of loan: 30 years (Usually 10, 20, or 30 years) <br /> <br />Interest Rate: <br /> <br />Current Rate <br /> <br />% (please call for our current rates) <br /> <br />Part C. . Project Sponsor Financial Infonnation <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's fmancial capacity. It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, rmancial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />3 <br /> <br />CFlA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.