My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150239 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150239 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:07:46 PM
Creation date
7/6/2007 2:40:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-021
C150239
Contractor Name
Greeley Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary — Greeley Irrigation Company — Contract No. C150239 <br />SECTION 1 — BORROWER INFORMATION <br />Name: Greeley Irrigation Company <br />Address: 1135 8t' Avenue, Suite B, Greeley, CO 80631 <br />Federal Identification No.: 84- 0217060 <br />Contact: Donna Coble, Secretary/Treasurer <br />Phone Number: 970 -353 -1292 <br />E -mail address: southard @info2000.net <br />Type of Entity: a Colorado nonprofit corporation <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used to rehabilitate and upgrade the Greeley Canal No. 3, located in Weld <br />County, hereinafter referred to as the PROJECT, at an estimated total cost of <br />$2,211,750. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility Study," dated December 1, 2006, compiled by <br />Aqua Engineering, Inc., which is incorporated herein by reference, and, based upon <br />the feasibility report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of §§ 39- 29- 109(1)(a)(1), 37 -60 -119 and 37 -60 -120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br />Section 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br />SECTION 4 - BOARD APPROVAL <br />At its January 2007 meeting, the CWCB approved a loan from the Severance Tax Trust <br />Fund Perpetual Base Account to the BORROWER in an amount up to $2,211,750 for PROJECT <br />costs, not to exceed 90% of the cost of the PROJECT, plus a loan origination fee of 1% in <br />accordance with CWCB Policy No. 16, at an interest rate of 2.85% per annum for a <br />repayment term of 30 years. <br />SECTION 5 — SCHEDULE OF EXISTING DEBT <br />No existing debt. <br />SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Security <br />Appendix 1 to Loan Contract C150239 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.