My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00185 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00185 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:41 PM
Creation date
7/6/2007 11:39:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2007
Description
Intrastate Water Management and Development Section - Water Supply Reserve Account Applications for Grants
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Activity Summary: <br /> <br />The following Scope of Work was submitted with the application. The applicant indicates that this request . <br />for funds is to perform Tasks AlOO, A200 and A300. subsbquent work will be undertaken. <br /> <br />Scope of Work <br /> <br />Smith Williams Consultants, Inc. (Smith Williams) is pleased to present this proposal to Orchard <br />City for engineering services related to the Proposed IReservOir for Orchard City. This proposal <br />focuses on an alternative analysis for detennining th~ most cost efficient dam structure for the <br />proposed reservoir and the tinal engineering design for the selected alternative, <br />I <br />As part of the proposed scope of work, Smith Williams will prepare detailed flnal design <br />documents, which will be adequate to obtain approv~l from the State Engineer's Office and the <br />generation of construction bidding documents. <br /> <br />Task AIOO: Progrcs~ Meetings: <br /> <br />The Project Manager will conduct conference calls \>rith an Orchard City representative to review <br />progress on a weekly basis. Project coordination me~tjngs will be conducted as required to <br />complete the final design. A formal presentation to Orchard City will be required following the <br />completion of the tinal design. 'I <br /> <br />· Weekl)' Meetings - The primary topics of discussion will be progress to date., progress <br />planned for the next period, maintenance of ari action item log, and infonnation needs b>' <br />the team members or Orchard Cit)' to maintairl progress. The intent is to notify Orchard .' <br />City's P.M. as soon as any information or acti~n requirement is detennined. Action <br />items will only be formalized at the meeting. p'he Project Manager will attend all Weekly <br />Meetings, and the Principal-In-Charge will att~d as needed, anticipated to be once per <br />month and participate via conference cat! in aU other weekly meetings. <br />I <br />I <br />· Submittal Review Meetings - It is anticipated that (\\'0 submittal review meetings will <br />be held. one for the Design Criteria (Task A2qO) and a second for the Draft Final Design <br />(Task 500). Following review of the submittals, Orchard City will provide its written <br />comments to the Engineer. It is estimated thatlthc review meeting will be held <br />approximately one week after the Engineer re~eives comments on the submittal. <br /> <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.