My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00185 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00185 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:41 PM
Creation date
7/6/2007 11:39:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2007
Description
Intrastate Water Management and Development Section - Water Supply Reserve Account Applications for Grants
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br />~ <br /> <br />. <br /> <br />,I <br /> <br />. <br /> <br />.' <br /> <br />to hold the water right. Please clarify these relationships and why there does not appear to be any <br />cost-share. Please confirm that this is the case. <br /> <br />· Please provide a resume for Ralph Grover. <br /> <br />· In the scope of work for Ralph Grover, please clarify which draft reports are to be reviewed. In <br />addition, please clarify Mr. Grover's role in the preparation of the final report since it appears that <br />Mr. Slattery is preparing the final report. <br /> <br />· Please provide the rate and level of effort in relationship to the tasks. Currently, the costs associated <br />with the tasks are provided as a lump sum. <br /> <br />· In Attachment A of the grant application, in the third sentence, the project is described as raising the <br />level of the lake above the NLL. However, in other parts of the application it appears that the <br />applicant believes that a modification of the NLL is warranted. Please clarify. <br /> <br />Legal Issues <br />· The CWCB holds a NLL appropriation (4-77W3366) which the applicant is challenging based on the <br />evidence provided in a feasibility study conducted in 2003. What legal issues are associated with this <br />proposal? <br /> <br />Staff Recommendation: <br /> <br />Staff recommends approval of up to $35,000.00 for the Lake San Cristobal Project contingent upon <br />resolution ofthe items identified in the Issues/additional needs section. All products, data and information <br />developed as a result of this grant must be provided to CWCB in hard copy and electronic format as part of <br />the project documentation. This information will in turn be made widely available to Basin Roundtables and <br />the general public and will help promote the development of a common technical platform. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.