<br />1) <br /> <br />The lake has a surface area of 2,842 acres. The District has a right to store 37,709 AF, but the <br />maximum storage is 36,142 AF at gage height (OH) 30,0. The reservoir was restricted (since <br />March 1985) to GH 29.0 by the State Engineer's Office (SEO), due to safety concerns resulting <br />from the absence of a spillway. This one foot reduction in gauge height resulted in a storage loss <br />of 2,682 AF. Additionally, the SEO was concerned about the stability of the embankments <br />during flood stage. <br /> <br />, <br /> <br />. <br /> <br />This project provided for a spillway and other improvements as required by the SEO, to allow <br />the District to store at the normal highwater line of GH 30.0. The project consisted of the <br />construction of a new unregulated 40 foot wide spillway and outfall channel with a crest <br />elevation at GH 30.0, and toe drains. <br /> <br />Tetra Tech RMC, Inc. of Longmont completed the feasibility study in accordance with the <br />CWCB guidelines in June of 2005. The following is a summary of the construction costs <br />presented within the original feasibility study: <br /> <br /> Estimated Actual <br /> Item Cost Cost <br />1. Construction $629,808 $667,032 <br />2. Engineering $110,000 $113,000 <br />3. Legal $0 $16.393 <br />Total: $739,808 $796,425 <br /> <br />The contract to complete the work was awarded to NorthRidge Construction, Longmont, Colorado <br />in September 2006 for $665,682. Additionally, legal fees for the review of the construction . <br />documents and loan contract were not part of the original cost estimate. The District is requesting <br />loan funds to cover 90% of the total cost or $716,783. Based on their original authorization of <br />$666,000 for construction, a loan increase of $50,783 is required to cover the cost ofthe project. <br /> <br />DISCUSSION <br />Based on actual construction costs to complete the project and legal fees, not accounted for in the <br />original estimate, the overall cost of the project has increased by 7.6%, resulting in a loan increase <br />of 50,783. The CWCB staff has reviewed the construction bids, engineering and legal billings <br />received by the District, has inspected the project" and finds the overall construction cost of the <br />project to be reasonable and consistent with similar reservoir rehabilitation projects. <br /> <br />The amended loan amount for the District will be $723,950 ($716,783 for project costs and $7,168 <br />for the 1 % Loan Service Fee), at the present interest rate of 2.50 % for 30-years. The new annual <br />payment will be $38,047, which includes the 10% reserve requirement. The Company's current <br />approved loan of $672,660 has an annual paymen~ of $35,350, which includes the 10% reserve <br />requirement. <br /> <br />Table 1 illustrates the combined Financial Ratios for the Bijou Irrigation District and indicates an <br />ability to repay the $723,950 CWCB loan. <br /> <br />. <br /> <br />2 <br />