My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00160 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00160 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:03 PM
Creation date
7/6/2007 10:38:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/22/2007
Description
Agenda
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,.'" <br /> <br />. <br /> <br />3 <br /> <br />Wednesday. Mav 23. 2007 <br />CWCB Call to Order 8:00 a.m. <br /> <br />14. <br /> <br />Next Meeting Dates and Locations <br />a. Jut. 11-12,2007 <br />b. Sep. 18-19,2007 <br />c. Nov. 14-15,2007 <br /> <br />(8:00 - 8:05) <br />Craig, CO <br />Grand Junction, CO <br />Denver, CO <br /> <br />15. Review and Approval of Meeting Minutes (8:05 - 8:15) <br />a. March 12-13,2007 Minutes <br /> <br />16. Approve and/or Remove Items from Consent Agenda (8:15 - 8:35) <br /> <br />17. <br /> <br />. <br /> <br />18. <br /> <br />Basin Directors' Reports (8:35 - 9:15) <br />a. Colorado River (Mainstem) Basin Director's Report <br />b. Yampa-White River Basin Director's Report <br />c. San Juan/San Miguel-Dolores River Basin Director's Report <br />d. Gunnison River Basin Director's Report <br />e. North Platte River Basin Director's Report <br />f. South Platte River Basin Director's Report <br />g. Rio Grande Basin Director's Report <br />h. Arkansas River Basin Director's Report <br /> <br />Water Supply Protection Section - Navajo-Gallup EIS & Status of Navajo Settlement <br />Negotiations - Arizona Position (9: 15 - 9:35) <br /> <br />19. Water Supply Protection Section - H.R. 1833 - Preferred Storage Options Plan <br />Authorization (9:35 - 9:55) <br /> <br />BREAK <br /> <br />9:55 - 10:15 a.m. <br /> <br />20. Flood Protection Section - CWCB Resolution - Support for Chatfield Reservoir <br />Reallocation Project (10:15 - 10:25) <br /> <br />21. Flood Protection Section - Cherry Creek PMPIPMF Analysis - Status Update (10:25- <br />10:40) <br /> <br />22. Directors' Reports (10:40 - 11 :40) <br />a. DNR Executive Director <br />b. Interbasin Compact Commission Director <br />c. CWCB Director <br />d. State Engineer <br />e. Agriculture Commisioner <br />f. Division of Wildlife Director <br />g. Water Resource and Power Development Authority Director <br /> <br />. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.