Laserfiche WebLink
Final Gap Analysis: <br />South Platte Basin <br />Estimated <br />Demand met <br />Estimated <br />Increase in by future water <br />Gross Demand <br />Gross Demand supplies and <br />Subbasin <br />Shortfall <br />additional <br />(AF) <br />(AF) <br />conservation <br />(AF) <br />Denver Metro 120,600 108,100 12,500 <br />South Metro 88,600 38,300 50,300 <br />Upper Mountain 17,900 16,500 1,400 <br />High Plains 800 800 - <br />Northern 164,900 146,500 18,400 <br />Lower Platte 16,900 8,900 8,000 <br />TOTAL 409,700 319,100 90,600 <br />23 <br />Agricultural <br />24 <br />12 <br />