Laserfiche WebLink
<br />I <br />I COAL CREEK FEASIBILITY STUDY <br /> ENGINEER'S OPINION OF PROBABLE PROJECT COSTS <br />I ALTERNATIVE 5: UNDETAINED DIVERSION TO BOXELDER CREEK <br />ITEM UNITS QUANTITY UNIT COST TOTAL COST <br /> Excavation of canal to Boxelder Creek CY 80,000 $3 $240,000 <br />I County Road 66 Culverts EACH 2 $40,000 $80,000 <br />I County Road 6 Culvert EACH $40,000 $40,000 <br /> Precast Culvert Sections L.F, 150 $400 $60,000 <br />I For Railroad Crossing <br />Concrete Ditch Transitions For CY 20 $150 $3,000 <br /> Railroad Crossing <br />I Tunneling Under Rail Road LF 150 $500 $75,000 <br /> Concrete Drop at Boxelder EACH $20,000 $20,000 <br />I Creek <br />Modifications to Existing LS $150,000 $150,000 <br /> Bridges at CR 64 and HWY 1 <br />I Modifications to Existing LS $125,000 $125,000 <br />Railroad Bridge South of HWY 1 <br /> New Bridge at CR 62 LS $150,000 $150,000 <br />I Boxelder Creek Channel LS $450,000 $450,000 <br />Improvements Through Town to 1-25 <br /> and bike trail {Excavation, seeding and biketrail} <br />I Farm Land Right-of-way ACRE 20 $15,000 $300,000 <br /> Box Elder Creek Right-of-way Acquisition ACRE 30 $15,000 $450,000 <br />I Right-of-way Construction Permit LS $7,500 $7,500 <br /> SUlveying and Mapping {Box Elder Creek} LS $50,000 $50,000 <br />I Engineering LS $195,000 $195,000 <br />Legal LS $25,000 $25,000 <br />I FEMA CLOMR and Mapping LS $65,000 $65,000 <br />Road Repair SY 170 $25 $4,250 <br />I Traffic Control LS $25,000 $25,000 <br />Utility Crossings LS 12 $4,000 $48,000 <br />I Railroad Right-of-way permit LS $15,000 $15,000 <br />Subtotal $2,577,750 <br />I Contingency {at 25% of Subtotal} $644,438 <br />Total $3,222,188 <br />I <br />I <br />