My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01995
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 1:22:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0006X
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />November 10, 1999 <br /> <br /> <br />Cecil Tackett <br />Don Brinks <br />Robert Frye <br /> <br />Harold T. Slavinski, Pres./Chm. <br />George E. Chenoweth, Sec.!Treas. <br />Carrie S. Campbell, Mgr. <br />Gene Tautges, Assist. Mgr. <br /> <br />Board of Directors <br />Colorado Water Conservation Board <br />c/o Mr. William E. Green <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />RECEIVED <br /> <br />Nnv 1 5 1999 <br /> <br />CO!, <br />Cone.:., "' <br /> <br />., <br />,did <br /> <br />RE: STEVENS LAKE ENLARGEMENT PROJECT <br />CONTINUED AUTHORIZATION <br /> <br />Dear Board of Directors, <br /> <br />As I cannot be present for your meeting on the 22nd of this <br />month, the intent of this letter is to request continued <br />authorization for the above-mention project, which was <br />originally authorized for $1,912,000 in 1993. <br /> <br />Our original plans anticipated completion of this project by <br />now. For various and unfortunate reasons, we have experienced <br />delays. Mainly due to the drought in 1996, our attention turned <br />to a raw water line extension from the San Juan River to a new <br />water treatment plant to be located at our office complex. <br />Following an unexpected lawsuit filed only days prior to closing <br />on a revenue bond issue, this particular project was delayed not <br />quite two years. The issue has since been settled and <br />construction commenced in 1998, with completion expected by next <br />summer. <br /> <br />With continued rapid growth in our community and expansion of <br />our service boundaries, the Stevens Project remains an integral <br />part of the District's need to provide an adequate raw water <br />storage as well as a potable supply to its growing number of <br />customers. The past several years the District has continued <br />diligently working towards this project. Several thousand <br />dollars have been spent towards engineering work, which <br />continues, and aerial photography of the site is complete. <br />Acquisition of the additional land necessary for the enlargement <br />was finalized last year with a cost exceeding $243,000. <br />Monetary support from the San Juan Water Conservancy District <br />has helped defray some of these incurred costs. We expect to <br />have the Feasibility Study completed by May, 2000. Depending on <br />whether we go for a general obligation or a revenue pledge will <br />determine whether request for funds is made in 2001 or 2002. <br /> <br />100 Lyn Avenue <br />P.O. Drawer 4610 <br /> <br />pagosa Springs, Colorado 81157 <br /> <br />(970) 731-2691 <br />FAX (970) 731-2693 <br />
The URL can be used to link to this page
Your browser does not support the video tag.