My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01995
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 1:22:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0006X
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A feasibility study for the project was submitted in October 1992 by Camp Dresser & Mckee of <br />Denver. In April 1996, the present Construction Fund staff reviewed the report and requested <br />that the District update the study prior to entering into a contract for the construction loan. The <br />District indicated that there might be new project features and a request for additional funding. <br /> <br />Discussion <br /> <br />In response to the staffs request for an updated feasibility study, the District has submitted a <br />Plan of Study by Davis Engineering Service of Del Norte. The cost of the study is not expected <br />to exceed $10,000. Staff has reviewed the Plan of Study and finds that it meets the requirements <br />of the Construction Fund Guidelines and responds to the staff comments on the 1992 report. <br /> <br />The District is requesting a grant of$5,000 to assist in the cost of the feasibility study update. At <br />the same time, the District is relinquishing a $5,000 Small Dam Site grant for another project that <br />.' has been postponed for several years. Please see the attached letter from Carrie Campbell, the <br />District Manager. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board approve a grant of $5,000 (or fifty percent of the cost of the <br />study, whichever is less) from the Small Dam Site Account of the Construction Fund to the <br />Pagosa Area Water and Sanitation District for a feasibility study of the Stevens Lake <br />enlargement project. The study will be performed in accordance with the Plan of Study <br />submitted to the District by Davis Engineering Service. <br /> <br />Attachment <br /> <br />Cc: Carrie Campbell, Pagosa Area WSD <br />Alan Davey, Davis Engr. <br />Linda Bassi, AGO <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.