My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 3:39:02 PM
Creation date
7/3/2007 1:22:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
condemnation award to be applied to the prompt replacement, repair and restoration of <br />the PRO�ECr facilities or any portion thereof, or to repayment of this loan. Any net <br />proceeds remaining after such work has been completed or this ioan has been repaid, <br />shall be retained by the BoRROwER. If the net insurance proceeds are insufficient to pay <br />the full cost of the replacement, repair and restoration, the BoRROwER shall complete <br />the work and pay any cost in excess of the net proceeds. In the event BoRROw� <br />chooses to repay the loan, BoRROwER shall remain responsible for the full loan amount <br />outstanding regardless of the amount of such insurance proceeds or condemnation <br />award. <br />9. Captions. The captions and headings contained in this contract are for convenience <br />and reference oniy and shall not be constn.ied so as to define or limit the terms or <br />provisions contracted herein. <br />10.CWCB's Approval. This contract requires review and approval of plans, specificafrons, <br />and various other tectinical and legal documents. The CWCB's review of these <br />documents is only for the purpose of verifying BoRROwER's compliance with this <br />contract and shall not be construed or interpreted as a technical review or approval of <br />the actual design or construction of the PRO�ECr. Notwithstanding any consents or <br />approvals given to the BoRROwER by the CWCB on any such documents BORROWER <br />and any of its consultants, by preparing any such documents, shall be solely <br />responsible for the accuracy and completeness of any of said documents. <br />11. Waiver. The waiver of any breach of a term of this contract shall not be construed as a <br />waiver of any other term, or of any subsequent breach of the same term. <br />12. Addresses for mailing. Atl notioes, correspondence, or other documents required by <br />this con#ract shall be delivered or mailed to the addresses shown in the Section 'I <br />(BORROWER Information) of the Project Summary, for the BORROWER and to the <br />address below for the CWCB: <br />Colorado Water Consenra�tion Board <br />Attn: Construction Fund Section <br />1313 Sherman Street, Room 721 <br />Denver, CO 8Q203 <br />SPECIAL PROVISIONS (8/1/05 version). State Fiscal Rule 3-1 requires the inclusion of these <br />Special Provisions in every ST�TE contract, including grants. <br />1. CONTROLLER'S APPROVAL. CRS 2430-202 (1) <br />This contract shall not be deemed valid until it has been approved by the Controller of the <br />State of Colorado or such assistant as he may designate. <br />2. FUND AVAILABILITY. CRS 2430-202 (5.5) <br />Financial obligations of the State of Colorado payable after the current fiscal year are <br />contingent upon funds for that purpose being appropriated, budgeted, and otherwise made <br />available. <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.