My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01988
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 12:47:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0068FX
Contractor Name
Minturn, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(, <br /><~ <br /> <br />/V~J/ /S,J!' ////~ A7d?' ~~ <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />7)t1C;/~/t:/Yv p6 /~ / I~W'/ <br /> <br />~'_"-'--'-'-' . '-'-,.. "",.--"~~ <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive DiR:aor. DNR <br />Daries C. Lile. P .E. <br />Director. CWCB <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: Bill Green 13 ~ <br />DATE: November 2, 1995 <br /> <br />SUBJECT: Agenda Item 18.d., November 6-7, 1995 Board Meeting, <br />Water Project, Construction Loan Program, Requests for Approval on <br />Loans for New and/or Revised Projects, Town of Minturn - Bolts Lake <br />Dam Rehab. <br /> <br />The Town of Minturn is intending to purchase and rehabilitate Bolts Lake and Bolts Ditch as <br />a water supply and recreational facility. (please see the attached project summary and map). <br />Currently the Town has very little raw water storage capacity and is concerned about having <br />adequate water supplies during the low-flow winter months as well as being able to provide <br />for future demands which are expected to increase substantially in the next few years. As of <br />the date of this memorandum, work on the draft feasibility study was still underway but' it <br />appears was as if the project will provide the Town with about 100 acre-feet of storage at a <br />cost of about $400,000 for the water supply aspects of the project. <br /> <br />No Board action is requested at this time. A'more detailed memorandum with a staff <br />recommendation will be provided at the January 1996 Board meeting. <br /> <br />cc: Michael Gallagher, Mayor of Minturn <br />Richard Dangler, Town of Minturn <br />Leo Eisel, McLaughlin Water Engineers <br /> <br />w:\boardmem\nov95\18d.nov <br />
The URL can be used to link to this page
Your browser does not support the video tag.