Laserfiche WebLink
<br />9. <br /> <br />10. <br /> <br />CWCB Construction Fund Loan Application <br /> <br />Fonn Revised March 4, 1998 <br /> <br />, <br /> <br />8. <br /> <br />List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. (Please submit one copy of each completed study with <br />this application): <br />"Skyrocket Creek Debris Flow Analysis" (1997) by f..1ussetter Engineering <br /> <br />What is the estimated cost of the project? Please include estimated Engineering costs, and <br />estimated Construction costs, if known: <br />Estimated Engineering Co~ts: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 70 nnn <br />, <br /> <br />$ 63,450 <br />$ 133,450 <br /> <br />(Includes Canst. Admin.) <br /> <br />What loan amount and terms are you requesting? <br />completing this section): <br />Requested Loan Amount: $ <br />Term (length) of loan: <br />Interest Rate: <br /> <br />(please call for our current rates before <br /> <br />?E:;Jnnn <br /> <br />(Usually 7S~ of Estimated Toea! Costs) <br /> <br />20 years <br /> <br />3.5 % <br /> <br />(Usually 10. 20. or 30 years) <br /> <br />Part C. - Project Sponsor Financial Infonnation <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is impOrtant that the project <br />sponsor have the fInancial capacity to repay any loans made by the CWCB. The following <br />information is requested to assist the CWCB in a preliminary assessment of the applicant's <br />fInancial capacity. It is also requested that the project sponsor submit with this application copies <br />of the two most recent annual reports, fmandal statements, corporate reports or other current <br />documentation of financial condition and operations. <br /> <br />4 <br />