Laserfiche WebLink
<br />"ATfACHMENT ill" <br />COST ESTIMATES <br /> <br />1. North Poudre Reservoir No.6 Outlet Pitch <br />a. Supply Pipe <br />800 LF @ $10 <br />700 LF @ $95 <br />b. Place Pipe <br />1500 LF@ $20 <br />c. Stabilization <br />2500 CY @ $15 <br /> <br />Estimated ConstrUction Cost <br /> <br />$ 8,000 <br />S 66,500 <br />$ 30,000 <br />$ 37,500 <br />S 200.000 <br />$ 342,000 <br /> <br />d. Fill <br /> <br />25,000 CY @ $8 <br /> <br />2. <br /> <br />Bucktq'e Lateral Ditch <br />8. Supply Pipe <br />1000 LF@$30 <br />b. Place Pipe <br />1000 LF@ $40 <br /> <br />$ 30,000 <br /> <br />$ 40,000 <br /> <br />c. Fill <br /> <br />3,000 CY @ $8 <br /> <br />$ 24,000 <br />Estimated Construction Cost $ 94,000 <br /> <br />3. North Poudre Reservoir No. 5 Spillway Rehabilitation (see attached estimate) <br /> <br />Estimated Construction Cost $ 112,650 <br /> <br />4. Indian Creek Reservoir Spillway Rehabilitation (see attached estimate) <br /> <br />Estimated Construction Cost $ 88,900 <br /> <br />5. North Poudre Reservoir No. 4 Dam Rehabilitation (see attached estimate) <br /> <br />Estimated Construction Cost $ 322,400 <br /> <br />TOTAL ESTIMATE CONSTRUCTIONCOST................... $ 959,950 <br />ENGINEERING, LEGAL, CONTINGENCIES.......... S 28!tOOO <br />TOTAL ESTIMATED PROJECT COST............................. 51,244,950 <br />