My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01985
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 12:44:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0006X
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Please indicate: The number of shareholders: <br />or <br />The number of customers: <br /> <br />8965 <br /> <br />6. What is the purpose of this project? Check one: <br />_ New project <br />----..: Rehabilitation or replacement of existing facility <br />~ Enlargement of existing facility <br />_ Emergency repair <br />_ Other (please describe) <br /> <br />7. If the project is for rehabilitation of an existing dam, is the dam currently under a <br />restriction by the State Engineer? N () <br /> <br />8. General location of the proposed project. Include county and approximate di'stance and <br />direction from the nearest town or city: P ag 0 R a !=:p r; n g "', C' 0 Archul eta C oun ty <br />Stevens Reservoir is located approximately 3 miles northwest of <br />Pagosa Springs. <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilities, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />Enlargement of Stevens Reservoir will nearly triple its present <br />storage capacity and additional treatment facilities in order to <br />continue providing an adequate potable water supply to the rapidly <br /> <br />growingare~~The ~eserv~ir is rather eutrophic: enlargement will <br />substantially increase water quality. <br /> <br />10. Please list any preliminary analyses or investigations which have been done or are in <br />progress for the proposed project along with the names of the persons or firms who prepared <br />the analyses: A 1993 Feas ib il i ty Study was done by Camp Dres ser & Mckee <br /> <br />An updated study is being prepared by Allen Davey. of Davis Engineering <br />Services, Inc. <br /> <br />11. If preliminary cost estimates have been made, indicate the estimated cost of the project:_ <br />Originally estimated at $1.9 million in 1993 - with inflation. etc. <br />cost is estimated to be approximately $2.5 million. <br /> <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction <br />Fund? Yes, we have recently made such a request. <br /> <br />(h~ ty. Carxp/ddZ <br /> <br />Signature <br /> <br />qjz/ / qCj <br /> <br />, . <br /> <br />Date <br /> <br />1: \wctrans\secb\preapp.mis <br />
The URL can be used to link to this page
Your browser does not support the video tag.