My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150206 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150206 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:54:45 AM
Creation date
7/3/2007 11:19:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-034
C150206
Contractor Name
Overland Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Delta
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Summary - The Overland Ditch and Reservoir Company <br />Contract No. C150206 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: The Overland Ditch and Reservoir Company <br />Address: P.O. Box 397, Hotchkiss, CO 81419 <br />Federal Identification No.: 84-0434803 <br />Contact: Robert Church, President <br />Phone Number: (970) 835-8922 Fax Number: (970) 872-3586 <br />E-mail address:overlandditch@earthlink.net <br />Type of Entity: a Colorado nonprofit mutual ditch company <br /> <br />Section 2 - Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to <br />increase the storage capacity of the Overland Reservoir, located in Delta County, <br />hereinafter referred to as the PROJECT, at an estimated total cost of $1 ,255,555. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility of Restoration, Overland Reservoir," dated May, <br />2005, compiled by Bruce Marvin, Western Engineers, Inc., which is incorporated <br />herein by reference, and, based upon the feasibility report, the CWCB determined <br />the PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB's AUTHORITY <br />Severance Tax Trust Fund PerlJetual Base Account: This loan is made pursuant to <br />the provisions of 99 39-29-109(1 )(a)(I), 37-60-119 and 37-60-120, C.RS., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br /> <br />Section 37-60-122(1)(b) C.RS., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br /> <br />SECTION 4 - BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its July 18, 2005 meeting, the CWCB approved a loan from the Severance Tax Trust <br />Fund Perpetual Base Account to the BORROWER in an amount up to $1,141,300 for <br />PROJECT costs, not to exceed 90% of the cost of the PROJECT, with a loan origination fee of <br />1 % in accordance with CWCB Policy No. 16, at an interest rate of 2.50% per annum for a <br />repayment term of 30 years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />Two Colorado Water Conservation Board loans: (1) Loan No. C153307 (1979), original <br />amount $850,000, at an interest rate of 2% per annum for a term of 40 years; and (2) <br />C153527 (1988), original amount $850,000, at an interest rate of 5% per annum for a term <br /> <br />Appendix 1 to Loan Contract C150206 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.