Laserfiche WebLink
change order, and sample <br />bond at bidding. After the <br />the terms of this contract, <br />Construction Firms. <br />field order, as weli as the advertisement for bid and bid <br />CWCB staff verifies that these documents comply w�th <br />the BoRROwER may issue the notice to proceed to the <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />� <br />J. <br />K. <br />L <br />The BoRROwER shall construct the PRO�ECT in accordance with the approved plans <br />and specifications. <br />Upon completion of the PRO�ECT construction the BORROwER shall provide as-built <br />drawings of the PRO�ECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br />the BoRROwER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />Upon completion of the PRO�ECr construction, the BoRROwER shall arrange a final <br />inspection for the CWCB staff. <br />The BoRROwER shall pay all of the expenses reiated to the PRO�ECr when such bills <br />are due. <br />SECTION 9— ELIGIBLE EXPENSES The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PRO�ECT. <br />B. Preparing bid and construction contract documents. <br />C. <br />D. <br />E. <br />F. <br />G. <br />Preparing environmental assessment or environmental impact statements, <br />otherwise comptying with the Federal National Environmental Policy Act. <br />Complying with all federal, state, and local regulatory requirements, including <br />obtaining of all required permits. <br />Fish and wildlife mitigation measures required by federal, state, or local laws <br />regulations. <br />construction management for CWCB-approved change orders. <br />and <br />the <br />and <br />Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BoRROwER. <br />Engineering services for construction management, including design and <br />H. Interest during completion Of th2 PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />SECTION 1 O— DISBURSEMENT SCHEDULE <br />The BoRROwER shall prepare a periodic progress report which contains a statement <br />of the PRO�ECT costs expended for that period and shall forward said statement to <br />the CWCB. After receipt of the periodic progress report from the BoRROwER, and <br />Appenclix 1 to Loan Contract C150207 <br />Page 3 of 4 <br />