My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150207 Contract & Amend 1
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150207 Contract & Amend 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:37:19 AM
Creation date
7/3/2007 11:19:07 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150207
Contractor Name
East Mancos Highline Ditch Company
Contract Type
Loan
Water District
0
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary — East Mancos Highline Ditch Co. <br />Contract No. C150207 <br />SECTION 1 —BORROWER INFORMATION <br />Name: East Mancos Highline Ditch Company <br />Address: 43930 Hwy 160, Mancos, Colorado 81328 <br />Federal Identification No.: 84-1597601 <br />Contact: Regina Williams, Secretary-Treasurer <br />Phone Number: (970) 533-1289 <br />Fax Number: (970) 533-9807 <br />E-mail address: regina@mesaverdeelk.com <br />Type of Entity: a Colo�ado nonprofit corporation <br />SECTION 2 — PROJECT DESCRtPTION <br />Description of PRO�ECT: The BoRROwER applied to the CWCB for a loan to be used <br />for installation of pipeline in the existing East Mancos Highline Ditch corridor, located <br />in Montezuma County, hereinafter referred to as the PRO�ECT, at an estimated total <br />cost of $904,000. <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report on <br />the PRO�ECT entitled "The East Mancos Highline Ditch Pipeline Projecf," dated May <br />2005, which is incorporated herein by reference, and, based upon the feasibility report, <br />the CWCB determined the PRO�ECT to be technically and financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembfy <br />SECTION 4- BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION �IF NEEDED� <br />At its Juty 2004 meeting, the CWCB approved a Small Project Loan from the Construction <br />Severance Tax Trust Fund Perpetual Base Account to the BoRROwER in an amount up to <br />$904 fOt" PROJECT COStS plus $8,950 for the 1% loan service charge for a total loan <br />amount of $9,040 for the 1% loan service charge, with repayment terms of 2.50% per <br />annum for 30 years. <br />SECTION 5— SCHEDULE OF EXISTING DEBT <br />No existing debt. <br />SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />Appendix 1 to Loan Contract C150207 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.