Laserfiche WebLink
SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent interest in any rights that the BORROWER holds in the PROJECT <br />consisting of approximately 13,000 feet of pipeline and the associated access <br />easement rights as more particularly described in the attached Deed of Trust <br />("Collateral"). <br />SECTION 7- ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />The CWCB approved the loan with the following conditions: <br />a. The BORROWER shall provide to the CWCB a copy of the executed USDA <br />Conservation Program Contract to verify that the USDA would provide <br />engineering services and a grant for 75 percent of the final construction cost. <br />b. Security for the loan includes (1) a pledge of assessment revenues backed by an <br />assessment covenant, (2) a debt service reserve fund equal to two annual loan <br />payments (one payment set aside at the time of ~rst draw of funds and one third <br />of an annual payment set aside at the time the first three annual loan payments <br />are made), (3) a security interest in the BoRROwER's Funding Agreement, which <br />Funding Agreement shall include a"step-up" provision that requires the Funding <br />Agreement signatories to make the entire annual loan payment to the CWCB in <br />the event any of the members fail to pay their assessed share amount pursuant <br />to the Funding Agreement, and (4) a conditional assignment to the CWCB of the <br />Company's right to enforce said step-up provision in the event of a default. <br />SECTION 8- CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO~ECT. <br />B. The BORROWER's and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />Appendix 1 to Loan Contract C150201 <br />Page 2 of 4 <br />