My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150036 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150036 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2010 10:03:13 AM
Creation date
7/3/2007 9:46:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150036
Contractor Name
Weld County Tri Area Sanitation District
Contract Type
Loan
Water District
2
County
Weld
Bill Number
HB 00-1419
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Future development condition hydrology with existing facilities, <br />3. Future development condition hydrology with on-site detention and <br />proposed improvements, <br />a schedule of proposed improvements was recommended which included regional <br />detention ponds, channel improvements, and upgraded road crossings. A portion <br />of the recommended improvements are shown on Figure 6 on the following page <br />and summarized below. <br />A regional detention pond is proposed for construction in order to reduce the peak <br />historic flows within the Tri-Town Drainageway. The regional detention pond <br />would be located immediately south of the Tawn of Frederick on existing <br />agricultural land. The pond would need to contain approximately 146 acre-feet of <br />storage during a 100 year storm event and require approximately 60 acres of land <br />to be constructed. The beauty of the detention pond site is that it could be used by <br />the communities for multi purposes such as soccer fields as well as storm water <br />detention. The existing concrete box culvert under Main Street is proposed to be <br />incorporated into an improved detention pond outlet structure. Because of water <br />rights consideration, storm water retention was not contemplated as an option. <br />The communities have concluded that the regional detention pond site south of <br />Frederick is the best location and are moving ahead with purchase of the land. The <br />purchase of land is being accomplished by the Town of Frederick by a lh cent sales <br />tax as documented in Appendix 3. The land purchase price is anticipated to be <br />$350,000. The communities have viewed this project as an opportunity to enlarge <br />the existing detention pond and provide a regional multi-use amenity for all to <br />enjoy. From the numerous drainage master plans that have been prepared over the <br />last 10 years, there have been no other ideal locations within the basin to place this <br />regional detention pond. The I-25 Corridor Master Drainage Plan Godding <br />Hollow and Tri-Town Basins Soacth Weld Coicnty, also chose this site for the <br />regional detention pond. <br />Preliminary Geotechnical Analrsis: <br />In December 1999 Terracon drilled two soil bore holes in the vicinity of the <br />proposed regional detention pond as documentated within Appendix 4. Soil bore <br />hole TB-3 was located in the vicinity of the pond embankment and the soil consists <br />of topsoil, lean clay with sand, claystone and siltstone. The coefficient of <br />permeability of TB-3 at a depth of 4 feet was found to be 2.9E-06 <br />centimeters/second. Soil bore hole TB-4 was located in the vicinity of the pond <br />bottom and the soil consists of topsoil, lean clay with sand, sandstone and siltstone. <br />The coefficient of permeability of TB-4 at a depth of 4 feet was found to be 8.6E- <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.