<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />approximately 16 days. Option 1 is the low cost option for the 20 cfs flow <br />requirement. Option 2 provides redundancy in the pump system. If a pump were <br />to fail, the other pump could still operate. The costs associated with these <br />options are shown in Table 8. The New Cache La Poudre Irrigating Company <br />selected Option 2 in order to best meet the needs of its shareholders. The costs <br />shown are for estimating purposes. The pump configuration would be further <br />optimized to meet the specific operational needs of the NCLPIC during the <br />design phase. <br /> <br />Table 8 - Cost Estimates for Pump Configuration Options <br /> <br /> Option 1 - (1) 300 hp Pump <br /> Efficiency = 88% <br />Max. Capacity to Drury Reservoir = 9800 gpm <br /> = 22 cfs <br /> Type Qty Unit Price Total Price <br />Pumps Floway 27FKH 1 $39,700.00 $ 39,700.00 <br /> 30" Butterfly Valve I 1 $7,400.00 $ 7,400.00 <br />Fittings 30" Check Valve 1 $14,285.00 $ 14,285.00 <br /> JTotal Cost $ 61,385.00 I <br /> Option 2 - (2) 150 hp Pumps <br /> Efficiency = 86% <br />Max: Capacity to Drury Reservoir = 9160 gpm <br /> = 20 cfs <br /> Item Qty Unit Price Total Price <br />Pumps Floway 19FKH 2 $22,300.00 $ 44,600.00 <br /> 14" Butterfly Valve 2 $1,500.00 $ 3,000.00 <br />Fittings 30"x14" Tee 2 $3,550.00 $ 7,100.00 <br /> 30" Check Valve 1 $14,285.00 $ 14,285.00 <br /> ITotal Cost $ 68,985.00 I <br /> <br />New Cache Feasibility Study <br /> <br />28 <br /> <br /> <br />Note: Costs shown are for pumps and fittings required to connect to the pipeline. <br />They do not include pipe or fitting costs associated with the rest of the pipeline. <br /> <br />In order to operate the pumps, 3-phase power would be required at the site. Xcel <br />Energy is the power utility at the site. Existing power is available along Highway <br />392. Approximately 500 feet of new power line ($10/ft) and a 500 KVA <br />transformer ($15,000) would be required at the site. Xcel offers a construction <br />