My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150163 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150163 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:09 AM
Creation date
7/3/2007 8:36:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150163
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
04-1221
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Executive Summary <br /> <br />The New Cache La Poudre Irrigating Company (NCLPIC) manages water in the <br />Greeley Number 2 Ditch to provide for its shareholders. The NCLPIC <br />experiences operational inefficiencies throughout the system that amount to <br />approximately 2000 ac-ft per year. The NCLPIC plans to construct a 300 ac-ft <br />equalizer reservoir near Barnesville, Colorado to minimize the operational <br />inefficiencies and to better serve the shareholders near the end of the system. In <br />addition, the NCLPIC has filed an application with the Water Court for rights to <br />draw and store 2200 ac-ft of water in two additional reservoirs near Barnesville. <br />The overall project will require the construction of three reservoirs, a pumping <br />station, and a pipeline. The construction is feasible at the proposed site based <br />on the engineering issues analyzed. The estimated total project cost including <br />interest is $13.4 million which translates to $179 per share per year. -Based on a <br />project delivery of 4500 ac-ft per year (2500 ac-ft from new storage and 2000 ac- <br />ft from efficiency improvements), the total cost per ac-ft is approximately $2,978. <br />The average annual cost per ac-ft is approximately $99. Based on the net <br />revenues from irrigated crops in the service area, the benefit to cost ratio for the <br />project is approximately 5.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.