My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150115 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150115 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:40:26 AM
Creation date
7/2/2007 3:19:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150115
Contractor Name
Riverside Ditch and Allen Extension Company, The
Contract Type
Loan
Water District
11
County
Chaffee
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Collateral <br /> <br />As security for the loan the RDAEC will pledge assessment revenues backed by <br />assessment covenant and the project itself. This security is in compliance with CWCS <br />Loan Policy #5 (Collateral). <br /> <br />Economic Analysis <br /> <br />If the project is not completed the annual production of lands in the service area would <br />be reduced due to loss of water. <br /> <br />Social and Physical Impacts <br /> <br />The project will have no significant social impacts, since it will assure the continued <br />operation of an existing irrigation system. The project will have minor physical impacts, <br />once construction is complete. <br /> <br />Conclusions <br /> <br />1. The Riverside Ditch and Allen Extension Company is an incorporated entity. The <br />Company must be registered in the State of Colorado in order to enter into a contract <br />with the CWCS for the purpose of obtaining a Construction Fund Loan. <br /> <br />2. Rights-of-Way easements will be obtained in time for the construction of this project. <br /> <br />3. The project would provide for the continued delivery of irrigation water to share <br />holders. <br /> <br />4. The total estimated cost of the project is $e,OOO and will be financed by a grant from <br />the NRCS for engineering services, and by a $50,000 ewcs loan for construction. <br /> <br />Opinion of Feasibility <br /> <br />The project appears to be technically and financially feasible. <br /> <br />11\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.