My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01965
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2011 9:06:43 AM
Creation date
7/2/2007 1:38:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150146
Contractor Name
Rothe, Mildred L.
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Sub1ette Recharqe site: A 7,024-foot pipeline will be built <br />between the South Platte River and a lateral off the <br />Riverside Canal. A recharge well (100 HP Motor and 3000 GPM <br />pump) will be located at the river with electrical power run <br />from an existing power source. This system will be used to <br />fill 22 existing recharge pond sites. <br /> <br />The general locations of these features are shown in Appendix B. <br /> <br />Wa ter lliqhts <br /> <br />The Rothe farm currently has decrees on the 17 wells used for <br />irrigating their farm. These wells are augmented through GASP. <br />The proposed recharge wells and augmentation wells will require a <br />new water right and is currently being sought. This new recharge <br />water right will be for an average annual yield of 4800 acre <br />feet. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $392,758. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />$ 10,600 <br />$382,158 <br /> <br />$392,758 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 92,226 <br />$ 28,932 <br />$ 15,312 <br />$105,880 <br />$112,448 <br />$ 20,250 <br />$ 7,110 <br />$ 10,600 <br /> <br />$392,758 <br /> <br />1. Recharge Wells (3 total) <br />2. Augmentation Wells (2 total) <br />3. Ditch Pumps (2 total) <br />4. Electricity all wells <br />5. 15" PVC Pipe Installed (15,318 If) <br />6. 12" PVC Pipe Installed (3600 If) <br />5. Dirt Work (17,775 yds) <br />6. Planning and Design Costs <br /> <br />Feasibility Study <br />Rothe Aug Project <br />July 2003 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.