My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01963
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:06:07 AM
Creation date
7/2/2007 1:38:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150048
Contractor Name
Plumb and Dailey Ditch Company, The
Contract Type
Loan
Water District
6
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />/' <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />August 7, 2000 <br /> <br />Greg E.Wakher <br />Executive Director <br /> <br />Peter H. Evans <br />CWCB Director <br /> <br />Mr. Les Williams, President <br />Plumb and Dailey Ditch Company <br />9595 Nelson Rd. - Box C <br />Longmont, CO 80501 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Rehabilitation of Diversion <br />Small Project Loan Approval <br /> <br />Dear Les, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) <br />approved your Small Project Loan request on May 23,2000. I understand the loan will be <br />used to rehabilitate the Company's diversion on Boulder Creek. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum <br />amount of $42,000 with terms of 3.75% for 20 years. I have attached a copy of the <br />updated Board memo concerning the Plumb and Dailey Ditch Company. Please refer to <br />page 3 of that memo and to the section "Action taken by the CWCB May 23, 2000." <br /> <br />When the Board approves a Small Project Loan there remain several conditions: <br /> <br />a) A Feasibility Study is required. John Van Sciver has completed the study with input <br />from you. A copy of the study was sent to you under cover letter dated June 7, 2000. <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IlIian has <br />initiated the contracting process. It usually takes about 3 months to complete the <br />contract once the Board has approved the loan. <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. <br />Tim Feehan will contacted you regarding the CWCB requirements concerning project <br />design and construction. Tim will make construction inspections, which will be the <br />basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />Guidelines is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.