My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150190 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150190 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 11:10:49 AM
Creation date
7/2/2007 1:28:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150190
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />RESERVOIR <br />Contract No. C150190 <br />Original Loan Amount $155,035 <br />Adjustment (Increase): $355,000 <br />Adjusted Loan Amount $510,035 <br />� <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />Routing Number: 08 PDA opo�ss <br />LOAN CONTRACT AMENDMENT NO. 2 <br />(STANDARD CONTRACT — WAIVER #160 — APPROVED NOVEMBER 1 O, 2003) <br />This Amendment, made this March 14, 2008, by and betw��� the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado <br />Water Conservation Board ("CWCB"), and Beaver Reservoir Company, P.O. Box 120, <br />Hotchkiss, CO 81419, a Colorado nonprofit corporation (" BORROWER " or " CONTRACTOR "). <br />FACTUAL RECITALS <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />otherwise made available for payment in Contract Encumbrance Number C150190. <br />B. Required approval, clearance, and coordination have been accomp�isnea trom ana <br />with appropriate agencies. <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number <br />C150190, dated June 13, 2005, and amended on October 30, 2006 (" ORIGINAL <br />CONTRACT incorporated herein by reference, wherein the CWCB agreed to loan <br />money in the total amount up to $155,035, and the BoRROwER agreed to repay the <br />loan in accordance with the terms of the ORi�iNa� CoNTr�acT. <br />❑� <br />E. <br />F. <br />G <br />H <br />During construction of the Project, the BORROWER encountered unforeseen cost <br />overruns resulting from the remote location and high elevation of the reservoir, <br />adverse weather conditions, dewatering, and design changes. These items <br />increased the cost of the PRO�ECT by $417,569. To meet the increased costs, the <br />BoRROwER requested an additional $355,000 including the 1% loan origination fee <br />for a total loan amount of $510,035. <br />At its January 2008 meeting, the CWCB approved increasing this loan by $355,000 <br />for a total loan amount of up to $510,035 to finance up to 90% of the total Pro�ect <br />costs. The terms for the additional loan amount are an interest rate of 2.5% per <br />annum and a repayment period of 30 years. A loan service fee of 1% has been <br />included in the additional Ioan amount in accordance with CWCB Policy No. 16. <br />The BoRROwER has requested an extension in the time the CWCB has allowed for <br />completion of the Project. <br />The CWCB has reviewed the BoRROwER's request and has agreed to amend this <br />contract extend the time for completion of the project for an additional 2 years. <br />The CWCB and the BoRROwER have also agreed to amend this contract to increase <br />the amount of the loan by $355,000 including the 1% loan service fee for a total loan <br />amount of up to $510,035 which may be used to finance up to 90% of the total Project <br />cost. <br />NOW THEREFORE, it is hereby agreed that <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.