Laserfiche WebLink
<br />The Sear-Brown feasibility study includes a 32~year cash flow projection for all revenues <br />and costs of the storm water enterprise fund through the period of CWCB debt <br />retirement. The projection indicates that the monthly storm water service charge will <br />have to be increased from the present level of $4.00 per month in order to provide <br />positive cash flows over the next several years. <br /> <br />n <br />"J-... <br /> <br />Sources of Fundin~ <br /> <br />The District is intending to finance $1,715,500 of project costs with two CWCB loans of <br />$730,000 and $770,000 this year and in 2001, respectively, and with $21.5,500 in Energy <br />Impact Assistance funds from the Department of Local Affairs (DOLA). The District has <br />held discussions with DOLA but no funding commitment has been made. Potential <br />funding sources are summarized in Table 4. <br /> <br />Table 4. Potential Sources of Funds, Regional Detention Pond <br /> <br />Source <br /> <br />Amount <br />$730,000 <br />770,000 <br />$215,500 <br />$350,000 <br />$2,065,500 <br /> <br />r.' <br />t,: <br /> <br />CWCB loan, 2000 <br />CWCB loan, 2001 <br />Dept. of Local Affairs <br />Land contribution, Town of Frederick (1) <br />Total <br /> <br />(1) See the attached resolution from the Town of Frederick <br /> <br />The District may also. be eligible for funding through the Small Water Resource Projects <br />program of the Colorado Water Resources and Power Development Authority. Please see <br />the attached letter from Mike Brod of the Authority. <br /> <br />Economic Analvsis <br /> <br />The Sear-Brown feasibility study includes a detailed benefit/cost analysis, which <br />indicates a benefit/cost ratio of2.8 for the project. Benefits are estimated as the total <br />damages avoided during the life of the project. <br /> <br />Discussion <br /> <br />Based on our review of the feasibility study and discussions with the District~ staff <br />believes that the proposed storm water detention facility is economically and technically <br />feasible. Financial feasibility will depend upon the District's ability to obtain all <br />financing needed for the project and upon an increase in the monthly storm water service <br />charge. <br /> <br />4 <br />