Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />It <br />It <br />It <br />It <br />. <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />It <br />t <br />It <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />. Prepared by Rocky Mountain Consultants, Inc. <br /> <br />Table B-4 <br /> <br />Davis No.1 Dam Outlet Works And Spillway Rehabilitation <br />Structural Concrete Test Result Summary <br />February-March 2001 <br /> <br /> A vg. 28 Day <br />... . Date Placed ...Placement Location Air % Slump (in) Temperature (F) Compr~ive <br /> Strength (psi) <br />Specified -- 6 (+/- 1) 4 (max) 50-90 4000 <br />February 23,2001 Outlet Footing 6 3.5 64 4252.5 <br />March 14,2001 Outlet Structure, Walls 7.2 4.25 64 4425 <br />March 16, 2001 Pine Crib, North End 5.5 2.25 68 5210 <br /> <br />\\Neptune\Dept_ 43\0057 _059.mjb\Construction Report\testing.wb3 <br />