Laserfiche WebLink
<br />C:I WINDOWSITEMPIBreach2,JPG (local) <br /> <br />Page I of I <br /> <br /> <br />Breach : Looking across the breach, Note the circular shape of the slide scarp that angles <br />across the crest. With this physical geometry it appears a slide occurred that intersected the <br />upstream slope, The 13' vertical displacement of the slide mass would have resulted in a loss of <br />freeboard and subsequent overtopping, <br /> <br />file:C:1 WINDOWSITEM PIBreach2,JPG <br /> <br />5/5/98 <br />