My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01938
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
7/2/2007 11:17:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO WATER CONSERVATION BOARD <br />FEASIBILITY STUDY REVIEW MEMO <br /> <br />December 1999 <br /> <br />Report: Feasibility Report, Black Hills Reservoir Dam (Model Reservoir Dam) <br /> <br />Consultant: URS Greiner Woodward Clyde <br /> <br />Reviewer: Bill Green <br /> <br />1. As a general comment, the report should be revised to address the repair and <br />rehabilitation work necessitated by the'May 2nd dam break. The draft report deals <br />mainly with the situation prior to the dam break. <br /> <br />2. On page 2-1, a little more background information on the Model Land and Irrigation <br />Company (MLIC) might be useful, especially the recent history of ownership and the <br />restructuring of the company. <br /> <br />3. In the last paragraph on page 3-1, what is the estimated capacity of the reservoir? <br /> <br />4. The Division Engineer's expected administrative order should probably be mentioned <br />under Operating Criteria on page 3-3 or elsewhere in the report. Do we know what <br />the order is likely to include? <br /> <br />5. In Section Four, Water Rights: <br /> <br />· Add the full water rights listing developed by Bob Trout and describe any <br />transfers of Model water rights to other entities. <br /> <br />· Add the record of water deliveries provided by the Purgatoire River Water <br />Conservancy District (PRWCD) and the average annual yield of the Model water <br />rights. <br /> <br />· What do the agreements between the MLIC and the PRWCD provide for? How is <br />the water delivered? Copies of the agreements should be attached as appendices to <br />the report. <br /> <br />· How do the operating principles for Trinidad Reservoir impact the Model water <br />rights? <br /> <br />· What is the estimated consumptive use of the Model Reservoir water rights? <br />
The URL can be used to link to this page
Your browser does not support the video tag.