My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150179 Letter of Sustaintial Completion
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150179 Letter of Sustaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:37:01 PM
Creation date
7/2/2007 10:19:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150179
Contractor Name
Henry Bolen Ditch Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br />~ <br /> <br />j- <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />September 27, 2004 <br /> <br />Bill Owens <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT SCHEDULE Russell George <br />Executive Director <br /> <br />Mr. Raymond Keith, President <br />Henry Bolen Ditch Company <br />6875 c.R. 38 <br />Mancos, CO 81328 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Rick Brown <br />Acting Deputy <br />Director <br /> <br />Re: Contract Number CI50 179 - Henry Bolen Ditch Rehabilitation <br /> <br />Dear Mr. Keith: <br /> <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />August 1,2005. <br /> <br />In accordance with the Contract, the Henry Bolen Ditch Company owes $4,174.00 for interest during construction, as <br />calculated on the attached spreadsheet. Payment in the amount of $4,174.00 for interest during construction was received and <br />was credited to your account on August 1, 2005. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $2,069.84 is <br />due on August 1, 2006. A principal payment of$285,464.14 (NRCS grant funds)) was received and applied to your loan balance <br />of $328,786.48 on August I, 2005. This payment resulted in a final loan balance of $43,322.34, which your annual payment is <br />based on. A 1 % loan origination fee of $3,287.86 was charged to your account. The origination fee was based on your highest <br />cumulative loan balance of $328,786.48. Payment for the 1 % origination fee has been received and was credited to your account <br />on August 1, 2005. Chad Henderson, our Contract Administrator, will be amending the Promissory Note, contained as <br />Appendix 2 of the Contract, to reflect the final contract loan amount. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Henry Bolen Ditch Compauy on the <br />successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to you <br />in the future. <br /> <br />Sincerely, <br /> <br />"#&J~ <br /> <br />:tL;:let, P.E. <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. <br /> <br />Don Schwindt, CWCB Board Member <br />DNR Accounting <br />Water Supply Planning and Finance Section <br />Proj ect file <br />Contract fIle <br />Accounts Receivable <br /> <br />Contract Amount <br />Expended Amount <br /> <br />= $520,150.00 <br />= $43,322.34 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.