My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150125 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150125 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 10:14:08 AM
Creation date
7/2/2007 9:24:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150125
Contractor Name
Surface Creek Ditch & Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT SUMMARY - SURFACE CREEK DITCH & RESERVOIR <br />COMPANY - CONTRACT No. C150125 <br /> <br />SECTION 1 -BORROWER INFORMATION <br /> <br />Name: Surface Creek Ditch & Reservoir Company <br /> <br />Contact: Ellis Fritchman, President or Chuck Richards, Corp. Secy <br />Address: P. O. Box 399, 125 S Grand Mesa Drive <br />Cedaredge CO 81413 <br />Phone Number: 970-856-3165 <br /> <br />Type of Entity: Colorado nonprofit corporation <br /> <br />Section 2 - Project Description <br /> <br />Description of PROJECT: The BORROWER operates a system of reservoirs on Grand Mesa <br />in Delta County, providing agricultural irrigation water to 2,384 acres in a service area of <br />6,000 acres. Hotel Twin Reservoir and Dam is a Class 1 Dam with a capacity of 549 acre- <br />feet and a 35-acre surface area. The BORROWER applied for a loan in the amount of <br />$265,000 to finance up to 90% of the cost of rehabilitation of the dam including a chimney <br />drain, blanket drain, toe drain and a new service spillway pipe installed (PROJECT) at a total <br />estimated total cost of $363,500.' . . <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report on <br />the PROJECT prepared by the Borrower with assistance from the CWCB entitled <br />"Feasibility Study for Hotel Twin Dam Rehabilitation" dated November 2002, which is <br />incorporated herein by reference, and, based upon the feasibility report, the CWCB <br />determined the PROJECT to be technically and financially feasible. <br /> <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Small Proiect Loan: This loan is made pursuant to the provisions of Sections <br />37-60-119 and 37-60-120, C.R.S., which authorizes the CWCB to loan money for water <br />projects for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. <br /> <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$1,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br /> <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its November 2002 meeting, the CWCB approved a Small Project Loan to the <br />BORROWER in an amount up to $265,000 at an interest rate of 2.8% per annum for a <br />repayment term of 30 years. The interest rate for this loan is a blended rate based on <br />94% agricultural ownership of the shares (2.75%) and 6% municipal (low income) <br />ownership (3.75%). <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />No existing debt. <br /> <br />Appendix 1 to Loan Contract C150125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.