Laserfiche WebLink
<br />WOOD LAKE MUTUAL WATER & IRRIGA nON CO. - DAM REHABILIT AnON <br /> <br />.. <br /> <br /> <br />Looking Northeast Across Wood Lake at the New Outlet Tower <br /> <br />Project Description <br /> <br />This $550,000 project is the replacement of the Wood Lake Dam outlet works including all <br />control structures, installation of a toe drain, raising the existing saddle dam, and construction of <br />a new spillway to pass the 50% Probable Maximum Precipitation Flood. The need for the <br />improvements is a result of the State Engineer's Office dam safety requirements. Construction <br />commenced in September of 1999 and was completed in May of 2000. <br /> <br />Proiect Data <br /> <br />Sponsor: Wood Lake Mutual Water Co. County: Weld Water Source: Cache la Poudre <br />River <br /> <br />Terms of Loan: $458,000 @3.75% for 30-years Substantial Completion Date: May 1,2000 <br /> <br />Design Engineer: Smith Geotechnical - Fort Collins, Colorado <br /> <br />Construction Contractor: Barker Construction Company, Inc. - Fort Collins, Colorado <br /> <br />Design Criteria: <br /> <br />Dam height = 28-ft. Dam length = 1000-ft. <br />New outlet tower with 28" and 36" gate lifts and stems <br />Spillway length = 450- ft. <br /> <br />Annual Volume of Water Delivered by the Project: 3,106 acre-ft. <br />