Laserfiche WebLink
<br />Water Supply Reserve Account – Grant and Loan Program <br />Water Activity Summary Sheet <br /> <br /> <br />Applicant: Amount Requested: <br />Upper Yampa Water Conservancy $49,500.00 <br />District <br />Water Activity Name: Source of Funds: <br /> Morrison Creek Basin Account <br />Reservoir Feasibility Studies <br />Water Activity Purpose: <br /> Technical Assistance for a Feasibility Study <br />County: <br /> Routt <br />Drainage Basin: <br /> Yampa <br />Water Source: <br /> Morrison Creek (tributary to the Yampa River) <br /> <br />Water Activity Summary: <br />The UYWCD proposes to construct an up to 5,000 ac-ft reservoir on Morrison Creek to provide additional <br />water storage in the basin and a surface water supply to the Morrison Creek Water and Sanitation District. <br />Morrison Creek Water and Sanitation District (MCW&S) serves a fast growing area which contains the <br />largest number of platted and un-built lots in Routt County. Currently served only by wells the MCW&S <br />would like a surface water source that could be supplied by gravity to its customers. Concept planning <br />shows a potentially suitable dam site below the confluence of Morrison and Silver Creeks that could provide <br />approximately 5,000 acre feet of storage. This is with a water surface at the elevation of the saddle between <br />the Morrison Creek and Little Morrison Creek Drainage where MCW&S serves customers. <br /> <br />The UYWCD has water rights which can be changed for storage at this project and will acquire additional <br />rights if needed. The UYWCD have also completed detailed aerial surveys on which the conceptual work is <br />based. This proposal would provide funding for preliminary work regarding water quality, geotechnical and <br />environmental planning. The Morrison Creek drainage includes a tributary, Muddy Creek that at times <br />contributes considerable turbidity to the drainage. The UYWCD will evaluate the suspended sediment load <br />and its treatment potential as a potable water source. Preliminary environmental work including wetland <br />studies and preliminary geotechnical work are included in this proposal. <br /> <br />The UYWCD has been evaluating the diversion of water from Morrison creek into Stagecoach Reservoir for <br />five years. The excavation and channel work that would be required to divert this water is problematic and <br />they think a better option is a reservoir on Morrison Creek. Little gaging data is available on Morrison Creek <br />however information from the Division Engineers office indicates yields of 11,164 ac-ft, 7,797 ac-ft, and <br />13,141 ac-ft for spring runoff in 1991, 1994 and 1996 respectively. These numbers are above the confluence <br />with Silver Creek, indicating abundant water availability for reservoir filling. <br /> <br /> 1 <br /> <br />