My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01903
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 3:42:17 PM
Creation date
6/28/2007 3:14:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150174
Contractor Name
Guenzi Farms, Inc.
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Need for the Project <br /> <br />The Guenzi's own in their wells what is considered a very junior <br />water right. There are numerous downstream ditches, a reservoir, <br />and the Interstate Compact with Nebraska which all have senior <br />water rights to the Guenzi wells. Some of these rights are more <br />than 50 years senior to their wells. The Guenzi's have some ties <br />to ditch and reservoir waters but 25 out of the 31 wells are the <br />only source of water on the farm. Having wells for irrigation <br />requires that the depletions from the pumping of the Guenzi wells <br />be replaced during times when there is a "call" on the river by a <br />senior downstream water right. LWU has successfully been used for <br />the past 2 years to cover the depletions on these wells. The <br />Guenzi's has been very dependent on LWU to cover their <br />depletions. The Guenzi's with their 31 wells produce <br />approximately 1500 acre-feet of summer time depletions and <br />approximately 1000 acre-feet of winter time depletions. Projected <br />2004 depletions provided by the LWU can be found in Appendix A. <br /> <br />The Guenzi's wants to control and develop a recharge system that <br />will generate augmentation water to be used to offset the <br />depletions caused by their 31 wells. By controlling and <br />generating their own augmentation the Guenzi's can strengthen <br />their own coverage and help strengthen the LWU. <br /> <br />Feasibility Study <br />Guenzi Aug Project <br />April 2004 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.