Laserfiche WebLink
<br />p.'.... <br />1.:."<1 <br />- " <br /> <br />/. <br />_<t / C all- /51;J- <br />DEPAR1. NT OR AGENCY NUMBER <br />34..;.04-00 <br />CONTRACT ROUTING NUMBER <br />Q/a.03 <br />$100,000 <br /> <br />Form 6-AC-02A (R 1/88) <br /> <br />, ._-~ <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, Made this J A day of ;:e~~ 19?'~, by and between <br />the State of Colorado for the use and benefit of the Department of'\ Natural Resources <br />(Water Conservation Board) <br />hereinafter referred to as the State, and '2 Colorado River Water Conservation District <br />P.O. Box 1120, Glenwood Springs, Colorado 81602 <br /> <br />hereinafter referred to as the contractor, <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and <br />a sufficient unencumbered balance thereof remains availab~Jm;t in Fund Number 4008 , G/L Account <br />Number 5291X ,Contract Encumbrance Number ~; and <br />ABL Number 12910, Org. Unit Number 77-77-777. <br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS. pursuant to the provisions of section <br />37-60-122(1)(c). Colorado Revised Statutes. as amended. the <br />State is authorized to prepare feasib~lity reports on proposed <br />water projects; and <br /> <br />WHEREAS. the Contractor was created pursuant to the <br />provisions of section 37-46-103. Colorado Revised Statutes; and <br /> <br />WHEREAS. the Contractor is authorized pursuant to the <br />provisions of section 37-46-149 to accept contributions. <br />grants. or loans from the State: and <br /> <br />WHEREAS. the State. acting through the Colorado Water <br />Conservation Board (CWCB). has determined that it will support <br />the conduct of a feasibility study on the reformulation of the <br />Contractor1s proposed Juniper Cross Mountain Project to be <br />performed; and <br /> <br />WHEREAS. the Contractor desires to share in the cost of the <br />said feasibility study and to perform the said study in <br />cooperation with the State and the Recovery Implementation <br />Program (RIP) for Endangered Fish Species in the Upper Colorado <br />River Basin; and <br /> <br />WHEREAS. a Memorandum of Understanding defining the terms <br />and conditions for conducting the said feasibility study has <br />been executed by the Contractor. the State. the RIP. and the <br />U.S. Bureau of Reclamation. which Memorandum of Understanding <br />is attached hereto as Appendix A and by this reference made a <br />part of this contract: and <br /> <br />1620E* <br /> <br />395-53-0l-IO]4 <br /> <br />Page 1 of ~ pages <br />*(See instructions on reverse of last page) <br /> <br />/i; <br /> <br />. <br />