Laserfiche WebLink
<br />Project Summary - Bijou Irrigation District - Contract No. C150199 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Bijou Irrigation District <br />Address: P.O. Box 972, Fort Morgan, CO 80701 <br />Federal Identification No.: 84-0149210 <br />Contact: Kathy Samples, Secretary <br />Phone Number: (970) 867-2222 Fax Number: (970) 867-2294 <br />E-mail address:bijouirrig@twol.com <br />Type of Entity: a eolorado Irrigation District organized under the Irrigation <br />District Law of 1905 (C.R.S. 37-41-101 to -160) <br /> <br />Section 2 - Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used for the rehabilitation of Empire Reservoir, located in Morgan and Weld <br />eounties, hereinafter referred to as the PROJECT, at an estimated total cost of <br />$740,000. <br /> <br />B. Description of Feasibility Study: The eWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility Study: Empire Reservoir Spillway Construction," <br />dated April 2005, compiled by Tetra Tech RMC, which is incorporated herein by <br />reference, and, based ~pon the feasibility report, the CWCB determined the <br />PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of 99 39-29-109(1 )(a)(I), 37-60-119 and 37-60-120, C.R.S., which <br />authorize the CWeB to loan money for water projects from the eWeB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br /> <br />Section 37-60-122(1)(b) e.R.s., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's eonstruction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br /> <br />SECTION 4 - BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its May 24, 2005 meeting, the CWCB approved a loan from the Severance Tax Trust <br />Fund Perpetual Base Account to the BORROWER in an amount up to $672,660 for PROJECT <br />costs, not to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1 % in <br />accordance with CWCB Policy No. 16, at an interest rate of 2.50% per annum for a <br />repayment term of 30 years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />The Borrower has no existing debt. <br /> <br />Appendix 1 to Loan Contract C150199 <br />Page 1 of 4 <br />