My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01895
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 3:42:17 PM
Creation date
6/28/2007 2:20:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150174
Contractor Name
Guenzi Farms, Inc.
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, I .. <br />.. <br /> <br />GuenziFanns <br />May 24-27, 2004 <br /> <br />Agenda Item 21a <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Ken, Dave & John Guenzi County: Logan <br /> <br />Project Name: Groundwater Recharge Project Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte Water Source: Wells <br />Total Project Cost: $368;250 Funding Sources: CWCB, Guenzis <br /> <br />Type of Borrower: Agricultural Aver. Delivery: 2000 acre-feet (consumptive) <br /> <br />CWCB Construction Fund Loan: $331,425 <br /> <br />Interest Rate: 2.5% <br /> <br />Term: 30 years <br /> <br />Ken, Dave and John Guenzi own and operate a large group of farms in Logan County in NE <br />Colorado, consisting of approximately 2600 acres of sprinkler and flood irrigated farm ground. <br />Some of the ground is irrigated with direct flow water and some has reservoir water. All of the land <br />is also irrigated with 31 tributary groundwater wells, with the majority of the land relying solely on <br />the wells. Of the 31 wells 25 are operational at this time. Wells are currently augmented under <br />the Logan Well Users (LWU) plan of operation, to replace depletions during times when there is a <br />"call" on the river by a senior downstream water right. Their wells produce approximately 1510 <br />acre-feet of summer-time depletions and approximately 960 acre-feet of winter-time depletions. <br />The project will consist of purchasing a farm with existing recharge facilities that were previously fed <br />only by the Pwnee Ditch. One new recharge well will be drilled and one existing well rehabilitated. <br />The wells would pump up to a combined maximum rate of 12 cfs. This would produce up to 2000 <br />acre-feet annually from the 2 wells. Approximately 2100 feet of 12" PVC and 4500 feet of 21" PVC <br />piping will be installed. The CWCB loan will include only that portion of the farm purchase occupied <br />by the existing recharge ponds (100 acres of pasture with 3 pond areas). <br /> <br /> <br />Location Map <br /> <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.