My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150179 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150179 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:50:34 PM
Creation date
6/28/2007 1:19:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150179
Contractor Name
Henry Bolen Ditch Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br />Date: October 20, 2004 <br />Borrower: Henry Bolen Ditch Company <br />Principal Amount: $ 520,150 <br />Interest Rate: 2.50% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150179, dated October 20, 2004 <br />Loan Payment: $24,851.54 <br />Payment Initiation Date�`: <br />Maturity Date*: <br />* Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />1 . FOR VALUE RECEIVED the BoRROwER promises to pay the Colorado Water Conservation <br />Board ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, <br />pursuant to the LoaN CotvTr�acT and this promissory note. <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment <br />due �and payable one year from Payment Initiation Date (the date the CWCB <br />determines that the project is substantially complete), and annually thereafter. All <br />principal, interest, and late charges, if any, then remaining unpaid shall be due and <br />payable on or before the Maturity Date. <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman <br />Street, Room 721, Denver, Colorado 80203. <br />4. The CWCB may impose a late charge in the amount of 5% of the annuai payment if the <br />CWCB does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. <br />Any partial prepayment shall not postpone the due date of any subsequent payments or <br />change the amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued <br />interest and then to reduce the principal amount. <br />7. This Note is issued pursuant to the Loatv Cotv'rRa,cT between the CWCB and the <br />BORROWER The Loarv Co►vTr�acr creates security interests in favor of the CWCB to <br />secure the prompt payment of all amounts that may become due hereunder. Said <br />security interests are evidenced by a Security Agreement and Deed of Trust (�Security <br />Instruments") of even date and amount and cover certain revenues and reai property, <br />water rights and/or accounts of the BORROWER The Loatv CotvrRacr and Security <br />Instruments grant additional rights to the CWCB, including the right to accelerate the <br />maturity of this Note in certain events. <br />Appendix 2 to Loan Contract C150179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.