Laserfiche WebLink
<br />South Side Irrigation Company <br />January 28, 2003 <br /> <br />Page 2 <br /> <br />2. An approved contract must be in place before funds can be advanced. Jan IlIian has <br />placed this loan on our "hot list" and will initiate the loan contracting process with a goal <br />of having a signed contract in place by spring 2003. Once the contract is finalized the <br />Company may request loan funds to cover eligible project expenditures. <br /> <br />3. You must adhere to the CWCB DesiQn and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements. conceming project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water ConseNation Board. <br /> <br />i'iJ~ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water ConseNation Board <br /> <br />Attachments: <br /> <br />Updated Memo: South Side Res 0103 memo <br /> <br />cc (w/Attachment): <br /> <br />Mr. Eric Wilkinson, Colorado Water Conservation Board <br />CWCB Section B Staff <br />. Linda Bassi, AGO <br />Chrono File <br /> <br />c: Proj-New\South Side Res 01031tr <br /> <br />