Laserfiche WebLink
<br />SECTION XII <br /> <br />e, <br /> <br />. <br /> <br />SUMMARY AND RECOMMENDATIONS <br /> <br />A. General <br />The significant aspects of our <br />investigations on the existing sources <br />on Grand Mesa, existing facilities, <br />water production, water use, and future <br />system requirements will be reviewed. <br /> <br />B. Water Rates <br />Specific recommendations with respect <br />to existing or proposed water rates <br />based on actual production costs will <br />be made. Delta's water rates should be <br />based on actual costs particular to the <br />area and not based on water rates in <br />some other area. <br /> <br />C. Water Meters <br />Specific recommendations with respect <br />to the 'installation of residential <br />water meters will be made. <br /> <br />D. Future Water Supplies <br />Recommendations on future development <br />of the Grand Mesa source, the Gunnison <br />River sources, and future involvement <br />with the Project Seven group will be <br />made. <br />