Laserfiche WebLink
<br />" <br /> <br />BORROWER: EAST FORK MUTUAL IRRIG. <br />Contract No. C150166 <br />Original Loan Amount $259,860 <br />Increase: $121,412 <br />Adjusted Loan Amount $381,272 <br /> <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />Routing Number: 05 PDA C1 () 050 <br /> <br />LOAN CONTRACT AMENDMENT No. 1 <br />(STANDARD CONTRACT - WAIVER #160 - ApPROVED NOVEMBER 10, 2003) <br /> <br />This Amendment, made this September 20, 2004, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB"), and East Fork Mutual Irrigation Company, P. O. Box 511, <br />Kremmling, Colorado 80459, a Colorado nonprofit corporation ("BORROWER" or <br />"CONTRACTOR"). <br /> <br />FACTUAL RECITALS <br /> <br />A. Authority exists in the law, and funds have 'been budgeted, appropriated, and otherwise <br />made available for payment in Contract Encumbrance Number C150166, Fund Number <br />424, Appropriation Code MC4, Organization YYVY, GBL E166, Program WTRC, Object <br />Code 5882, Reporting Category 0166. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number C150166, <br />dated March 1, 2004 ("ORIGINAL CONTRACT"), incorporated herein by reference, wherein <br />the CWCB agreed to loan money in the total amount up to $259,860, and the BORROWER <br />agreed to repay the loan in accordance with the terms of the ORIGINAL CONTRACT. <br /> <br />D. During engineering planning and design of the Project, the method of slope stabilization <br />remediation not anticipated in the original project cost estimate was altered. This <br />revision increased the cost of the PROJECT by $160,280. To meet the increased costs, <br />the BORROWER requested an additional $121,412 for a total loan amount of $381,272. <br /> <br />E. At its September 2004 meeting, the CWCB approved increasing this loan by $121,412 <br />($120,210 for Project costs and $1,202 for the 1% Loan Service Fee) for a total loan <br />amount of up to $381,272 of the total Project costs. The terms for the additional loan <br />amount are an interest rate of 2.5% per annum and a repayment period of 30 years. <br /> <br />F. The CWCB and the BORROWER have agreed to amend this contract to increase the <br />amount of the loan by $121,412 (($120,210 for Project costs and $1,202 for the 1% Loan <br />Service Fee) for a total loan amount of up to $481,272 to finance Project costs. <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. Consideration for this Amendment to the ORIGINAL CONTRACT consists of the payments <br />that shall be made pursuant to this Amendment and the ORIGINAL CONTRACT, and the <br />promises and agreements herein set forth. <br /> <br />2. 2. It is expressly agreed by the parties that this Amendment is supplemental to the <br />ORIGINAL CONTRACT and all terms, conditions, and provisions thereof, unless specifically <br /> <br />Page 1 of 3 <br />