My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01881
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:31 AM
Creation date
6/28/2007 10:00:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150166
Contractor Name
East Fork Mutual Irrigation Company
Contract Type
Loan
Water District
50
County
Grand
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />As security for the loan, the East Fork Mutual Irrigation Company will pledge assessment <br />revenues backed by assessment covenant, the project itself, and the Company's headgate to assure <br />repayment of the loan. This security is in compliance with CWCB Loan Policy #5 (Collateral). <br /> <br />CONCLUSION: <br /> <br />Based on staffs review of the original feasibility cost projections, the supporting documentation <br />provided by Company for the revised design alternative, staff finds the requested loan increase of$120,210 <br />to be economically, financially, and technically sound. <br /> <br />STAFF RECOMMENDATIONS: <br /> <br />Staff recommends that the Board approve an increase of$121,412 ($120,210 for project costs <br />and $1,202 for the 1 % loan origination fee, in accordance with CWCB Loan Policy No. 16) from the <br />Construction Fund. The additional $121,412 increment of funding would be for 30-years at the present <br />lending rate of2.5%. Security for the loan will be a pledge of assessment revenues backed by <br />assessment covenant and other Company property adequate to assure repayment of the loan, in <br />accordance with CWCB Loan Policy #5. <br /> <br />Staff further recommends that final approval of the loan be conditioned upon standard <br />contracting provisions ofthe CWCB. <br /> <br />5 <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.